Wednesday 11 October 2017

Distance Schedule


The above image is the 22nd Sub distance schedule showing the section of the line I intend to model. It incorporates just over 20 miles of the branch line with 6 Localities. 

The lower deck will include Homan through to Battle Ground and hopefully I can fit the location of Lucia as it was a big transfer area of cut logs to flat cars. 

After Lucia the line crosses the South Fork of Lewis River and enters the Tunnel. I'm attempting to fit this section into a helix. 

After the helix trains will run to Yacolt that spans a 20' wall and forms the main destination on the layout. In terms of operations it will be the point passenger service ends and originates from. Log trains to be transported by NP will be made up here as well and provide the destination to supply the logging world beyond.









No comments:

Post a Comment